Screening of excavated material scope of work

Screening of excavated material scope of work

Remediation Work Plan Revision 2 2 UST pit will be excavated Excavation will continue onsite where they exceed the IDCL Excavation of soils will continue to the south on the Alben Motel property Soil excavation on the Alben Motel site will continue until soils exceeding the residential

Here you can submit any questions and we will get back to you as soon as possible. We will not disclose the information you submit to anyone, please rest assured.

02220 Excavation Backfill and Fill for Structures

101 SCOPE OF WORK: A The work included under this Section consists of furnishing material and equipment, and performin g al l labor nec ess ary for excav ati ng, bac kf illing, filling and pa cti on of area s to be occupied by facilities or utility systems to be constructed

Learn More Details

312333 Trench Excavation and Backfill rev 62305 du

Payment: No separate payment will be made for rock excavation 7 The cost of such work, and all cost incidental thereto, shall be included in the unit prices bid for water mains G Excavation for Vaults or Manholes: Excavate to a minimum of 12inches below the planned elevation of the base of the vault or manhole

Learn More Details

6 Removal by Dredging and Excavation ITRC

61 Removal by Dredging and Excavation Background Information Dredging of harbors and rivers for navigational purposes has been practiced for centuries and studied extensively By parison, environmental dredging dredging for the sole purpose of removing contaminated sediment is a relatively new development

Learn More Details

A Guide to OSHA Excavations Standard Duke Universi

excavation is deep; however, when front end loaders are used to dig the excavations, the soil surcharge load must be placed as far back from the edge of the excavation as possible, but never closer than 2 feet 061 meters Work crews in the excavation are the minimum number needed to perform the work

Learn More Details

ATTACHMENT 1 SCOPE OF WORK CONSTRUCTION OF REINFOR

he Contractor shall dispose of excavated material B NEW WORK 1 The Contractor shall construct a reinforced concrete slab of 670 meters 22 feet long by 304 meters 10 feet wide by 015 meter 6 inches thick with reinforcement of 5 8steel bars @ 030 meters in both directions

Learn More Details

ATTACHMENT AA DETAILED SCOPE OF WORK DEMOLITION AN

Attachment AADetailed Scope of Work Demolition and Removal ITBDOT12 134006LH 10 A building cutoff shall be priced based on section 10 of this Attachment The unit amounts shall be determined by the square footage of the portion of the building to be demolished and removed during the cutoff process

Learn More Details

City of Coquitlam REQUEST FOR PROPOSALS

Excavated and Contaminated Soils The scope of work generally consists of the provision of all labour and equipment for loading, hauling, record keeping, supervision and disposal of various excavated materials and wet fill material from the City of Coquitlams Service Centre Spoils Site, located at 500 Mariner Way, Coquitlam, BC

Learn More Details

Civil Construction ckyinc

he excavated material below elevation 5 foot NGVD was within the daily tidal range of the Napa River and required special care and methods of excavation A portion of the excavated material was old fill and contained construction debris that was screened and separated out Final excavated grades were seeded with native grass seed

Learn More Details

CONTAMINATED SOIL REMEDIATION GLEI

he scope of work included clearing and grubbing, removal of site debris, construction of a lined stockpile screening area, excavation, screening and offsite disposal of waste soil, removal and replacement of existing site utilities, backfilling with onsite and imported soil fill, placement of a clay cap, and site restoration

Learn More Details

Detailed Construction Scope of Work Template Free

Attachment 3 Detailed Scope of Work Construction of the New Franklin Park Storage Building Page 1 of 13 General Contractor GC or the SubContractor as designated by the GC is Responsible to: 1 Locate all underground utilities and their depth and location prior to start of work All private utilities

Learn More Details

EARTHWORK AND SITE WORK nidwater

his section covers earthwork and site work Trench excavation, backfill and trench surface restoration, as well as clearing and grubbing, are covered elsewhere in these specifications 18102 Description of Work Work under this section shall include, but not be limited to, demolition, site grading, structure

Learn More Details

Estimating Final Exam Flashcards Quizlet

easuring sitework and excavation work is the same as measuring most other work of a construction project False Before the estimator can measure the site work, he or she has to make an assessment of excavation requirements from data in the specifications and drawings and from information gathered on visits to the site

Learn More Details

ETHOD OF STATEMENT FOR SITE PREPARATION EXCAVATION

he scope of this method of statement is outline the methodology of earthwork excavation and backfilling generally QCS section 6 12 will be followed unless specifically amended by the project specification and noted here under 21 QCS section 6 12 earthworks

Learn More Details

Excavation and Backfilling of Soil Work Sequence a

Scope of Work for Excavation and Backfilling of Soil Setting out of corner benchmarks Survey for ground levels Survey for top levels Excavation to approved depth Dressing of loose soil Making up to cut off level Constructing dewatering wells and interconnecting trenches

Learn More Details

Excavation in Construction from Construction Knowl

he scope of the excavation job varies from digging footings for a small building to moving millions of cubic yards of earth The one thing all excavation jobs have in mon, though, is that careful planning is the key to success

Learn More Details

EXCAVATION WORK Safe Work Australia

Excavation work generally means work involving the removal of soil or rock from a site to form an open face, hole or cavity using tools, machinery or explosives A person conducting a business or undertaking must manage risks associated with all kinds

Learn More Details

REMEDIATION WORK PLAN INgov

Remediation Work Plan Revision 2 2 UST pit will be excavated Excavation will continue onsite where they exceed the IDCL Excavation of soils will continue to the south on the Alben Motel property Soil excavation on the Alben Motel site will continue until soils exceeding the residential

Learn More Details

Scope Of Work Crushing And Screening Equipment

Scope of work provisions for operating engineer cranes, pile driverShops, field survey work, asphalt screening, soil, cement and crushing plants for all excavation and work related to the excavation, without limiting the scopeObjectives and scope on priy and secondary crushing using jaw

Learn More Details

SCOPE OF WORK EXCAVATION SHORING KINGSWAY PROJECT

SCOPE OF WORK EXCAVATION SHORING KINGSWAY PROJECT 11 GENERAL A WORK The term Workincludes all labor, materials, equipment and services required of the CONTRACTOR, as shown, described or inferred in the Contract Documents The CONTRACTOR is only to use its own forces and or OWNER CONSTRUCTION MANAGER approved subtrades to undertake the Work

Learn More Details

SCOPE OF WORK State

1 Work area shall be cleaned of all debris at the end of each workday 2 The contractor shall provide materials safety equipment and all required tools and equipment to plete the project 3 The contractor shall provide work schedule showing starting and pletion of the project and the date and time planning to work in the residence yard 4

Learn More Details

SECTION 02115 SOIL HANDLING AND DISPOSAL PART 1 GE

SECTION 02115 SOIL HANDLING AND DISPOSAL PART 1 GENERAL 101 SCOPE OF WORK A This Section provides procedures and requirements for handling soils excavated during construction activities and includes furnishing all labor, equipment, materials, transportation, and incidentals for performing the following work, to the

Learn More Details

SECTION 02220 EARTHWORK Chattanooga

excavating all classes of material encountered, pumping, draining and handling of water encountered in the excavations, handling, storage, transportation, and disposal of all excavated and unsuitable material, construction of fills and embankments, backfilling around structures and pipe, backfilling all trenches

Learn More Details

SECTION 2 EARTHWORKS Procurement Notices

as required; the handling, storage, transportation and disposal of all excavated material; all necessary sheeting, shoring and protection work; preparation of subgrades; pumping and dewatering as necessary or required; protection of aacent property; backfilling; pipe embedment;

Learn More Details

STANDARD CONSTRUCTION SPECIFICATIONS FOR EARTHWORK

aterial placed in an excavated area B Bedding Ground or support in which pipe is laid C Borrow Material used as fill and or backfill which is obtained from a source other than required excavation D Compaction Tamping by hand or machine to achieve required density in soils E Disposal Site

Learn More Details

STATE OF WASHINGTON DEPARTMENT OF LABOR AND INDUST

bulldozing of material excavated from a public work site at various disposal sites Based on my review of the facts of this case and an analysis of applicable law, it is my determination that the bulldozing of material excavated from a public work site at various disposal sites as was done in this case is subject to prevailing wage requirements

Learn More Details

Work Procedure of Excavation at Construction Site

Work procedure for excavation at construction site involves understanding of centre line and excavation drawings, setting out of plan on ground, excavation of soil and removal of excess soil Quality checks such as recording ground level and marking of reference points should be done

Learn More Details